Apr. 20th, 2021

Scheduling

Apr. 20th, 2021 10:04 pm
billroper: (Default)
We got the heads up yesterday about the upcoming schedule for our kitchen renovation. The cabinet installers will be back on Saturday to finish up all the cabinet bits that need to be done.

The countertops will be installed next Tuesday afternoon.

And that will leave the backsplash tile.

We'll see how everything sorts out.

Profile

billroper: (Default)
billroper

March 2026

S M T W T F S
1 2 3 4 5 6 7
8 9 10 11 12 13 14
15 16 17 18 19 20 21
22 23 2425262728
293031    

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 25th, 2026 11:23 pm
Powered by Dreamwidth Studios