And Back To Work We Go
Nov. 16th, 2020 10:01 pmBack to work. Still fixing bugs.
In other news, I moved the free-standing cabinet over the master bathroom toilet, grabbed a screwdriver, and adjusted the water level in the toilet tank so that the tank will stop overflowing into the refill tube when we walk across the floor. With any luck, the water bill will go down now...
In other news, I moved the free-standing cabinet over the master bathroom toilet, grabbed a screwdriver, and adjusted the water level in the toilet tank so that the tank will stop overflowing into the refill tube when we walk across the floor. With any luck, the water bill will go down now...