Jul. 15th, 2004

billroper: (Default)
The contractor has arrived and the first bathroom is being ripped to shreds as I write. Since this is the one that hasn't had a working toilet in more than a month, we won't notice it a lot.
billroper: (Default)
The contractor has arrived and the first bathroom is being ripped to shreds as I write. Since this is the one that hasn't had a working toilet in more than a month, we won't notice it a lot.

Profile

billroper: (Default)
billroper

May 2025

S M T W T F S
     1 2 3
4 5 6 7 8 9 10
11 12 13 14 15 16 17
18 19 20 21 22 23 24
25 26 2728293031

Most Popular Tags

Style Credit

Expand Cut Tags

No cut tags
Page generated May. 28th, 2025 05:28 am
Powered by Dreamwidth Studios